ICON Launch Coaster Civils Works

The Project Civils Works associated with ICON Launch Coaster at Blackpool Pleasure Beach Project Summary: ICON was the UK’s first double launch rollercoaster which opened to the public at Blackpool Pleasure Beach in May 2018. ‘ICON launches visitors on an exhilarating journey where they feel the same acceleration as a Formula 1 driver before twisting and turning at high speeds … Read More

Ribble Valley Private Residential Development

The Project Ribble Valley Private Residential Development Project Summary: The project comprised the construction of a sustainable house set within idyllic surroundings. The design team ensured that the Client was able to maximise the stunning moorland views through the installation of large glazed elevations, balconies and carefully positioned terraced areas. The property was constructed utilising a timber SIPS system with … Read More

Berkeley House Luxury Apartments, Harrogate

The Project Berkeley House Luxury Apartments, Harrogate Project Summary: The Residential Development in South Park Road close to the centre of Harrogate comprised the alteration and refurbishment of an existing four storey building into six Luxury Apartments. In addition and in order to fully utilise the grounds of the existing property a new three storey stone extension was built within … Read More

Alum Scar Private Residential Development

The Project Alum Scar Private Residential Development Project Summary: Multi phased works which were completed to allow the owner of the Georgian property to provide a family home for their growing family. Following an initial extension and alterations project which include the formation of swimming pool and gym facility a complete overhaul of the premises was carried out which included … Read More

Project Works for Princes Food Ltd

The Project Nationwide Works for Princes Food Ltd Project Summary: Donald Lomax and Partners have provided Quantity Surveying services for Princes Foods Ltd for over 10 years. During that time DLP have been in involved in a wide and varied range of projects at a number sites throughout the UK. Projects range from the multi-million pound re-roofing of production areas, … Read More

Plot 5 Futures Park, Bacup

The Project Manufacturing Facility, Plot 5 Futures Park Project Summary: Works to transform plot 5 at Futures Park into a manufacturing facility for a prestigious international company have recently been completed. The manufacturing facility has a floor area of 4,300m2 along with 330m2 of office facilities. The building will be occupied by Orthoplastics Limited, who are a world leader in … Read More

Tennis Dome at Stoneyhurst College

The Project Formation of Tennis Dome at Stoneyhurst College Details Project Summary: The project comprised the completion of civil engineering works associated with the formation of a two court tennis dome on the Stonyhurst College campus site. The works included bulk earthworks to formation, perimeter ring beam installations, formation of retaining walls and plant bases along with the completion of … Read More

St Peter’s Church Hall, Heysham

The Project St Peter’s Church Hall Project Summary: The project comprised the renovation and modernisation of the existing Church Hall which had been originally converted in the 1960’s. The development has created an exciting new facility which will be used by the church and the wider community. The refurbishment works saw the formation of a new first floor meeting room, … Read More

Dance Studios at Hammond School

The Project Dance Studios at Hammond School, Chester Project Summary: The construction of the Centenary Dance Studios was the third major development project which HPA & DLP have undertaken for the school, having previously overseen the construction of the New Performing Arts Centre and Dance Studios Nr One. The Centenary Studios comprised the construction of three new state of the … Read More

Warehouse Expansion, Fort Vale Manufacturing Limited

The Project Warehouse Expansion, Fort Vale Manufacturing Limited Project Summary: The project comprised the construction of a Warehouse Storage Facility 1850m2 in area with 10m clear eaves height. The Warehouse was constructed on piled foundations with a structural steel frame. The external elevations consisted of brickwork, cladding and glazing to match adjacent buildings. A specialist FM2 floor slab installation with … Read More